•  

            Paid Advertisement by Houston Methodist Orthopedics & Sports Medicine   Advertise with FBISD

             


            ALL ADVERTISEMENTS ARE PAID FOR BY THEIR RESPECTIVE ENTITIES.

          Upcoming Events

          • There are no upcoming events to display.

          View Calendar

          RGE Ranger News

          •  

            Congratulations Ridgegate Elementary!!

            ckh

             

             

            Comments (-1)
          • Arrival and Dismissal Procedures

            Morning Drop Off

            For the safety of our students, please drop off all car riders on the side lot of the school (between 7:30 and 8:00 am-not in the front driveway. The front driveway is for school buses and daycare only. By getting your child to school between 7:30 and 8:00, they have time to eat breakfast and sit down in the classroom to prepare for their busy day ahead.   Please do not dropoff your child in the street as it increases traffic congestion.  Please respect your neighbors and refrainfrom blocking their driveways and streets.

             

            Afternoon Pickup

            PK AM Pick up and PM dropoff is on the side lot of the building. Please do not park in the front or block the fire lanes. General dismissal will begin at 3:25pm for all students. Walkers are dismissed first followed by car riders. Please respect your neighbors and refrain from blocking their driveways and streets and/or standing in their yards. In meeting walkers, please wait at the bike rack and not the doorways as it creates an unsafe congestion.

            Comments (-1)

          2018 Bond @ RGE

          • 2018 Bond  

            November 6, 2018

            2018 Bond Total: $992.6 million

            Total amount allocated for Ridgegate Elementary: $5,217,226*

            RGE Bond Projects include: 

            Site Enhancements

            • Site drainage improvements 

            Building Systems / Life-Cycle

            • New roofing
            • Exterior cleaning and repair
            • Exterior waterproofing
            • New windows
            • New heating & air conditioning equipment
            • Exhaust system improvements
            • Plumbing and site utility improvements
            • Electrical upgrades and surge protection 

            Life Safety & Security

            • New security alarm system

            Fine Arts

            • Renovation and expansion at stage

            Facility Equity & Access

            • Classroom furniture
            • Kitchen renovation and expansion
            • Ramp at stage for improved access
            • Drinking fountains with bottle fillers
             

            *This amount includes costs associated with architectural, engineering, financing, and legal fees, and other pre- and post-construction expenses.

             

            For more information, visit www.fortbendisd.com/bond

            Printable PDF available on Bond webpage.

          FBISD's Profile of a Graduate

          •  A Fort Bend ISD Graduate has
            a rigorous academic foundation,
            strong character, and is...

             

                Equipped with Skills for Life      ...equipped with skills for life.

             

                Servant Leader      ...a servant leader.

             

                Effective Communicator      ...an effective communicator.

             

                 Critical Thinker        ...a critical thinker.

             

                Compassionate Citizen      ...a compassionate citizen.

             

                Collaborative Team Member      ...a collaborative team member.

             

                Life-long Learner      ...a life-long learner.

             

            FBISD Logo

          CLOSE
          CLOSE